Your schedule-compliance number is a guess. Sockeye makes it real.
Sockeye runs next week’s schedule on top of SAP PM or Maximo, so schedule compliance, planned vs reactive and PM completion are generated automatically, not hand-built in Excel. No rip-and-replace.
Free 90-second benchmark · get the board-ready one-pager for your next review · no sales call.
Your KPIs are only as good as
one planner’s spreadsheet.
- ✗ The schedule-compliance number you report up is assembled by hand, if it exists at all.
- ✗ The whole week lives in one planner’s Excel file. They’re out, you’re blind.
- ✗ You find out who was really available on Monday, not when you committed the plan.
- ✗ Break-in work wrecks the week and no one can show the real planned vs reactive split.
- ✗ When leadership asks why compliance slipped, you’re guessing.
How does your maintenance scheduling really stack up?
Answer 10 quick questions. Get your Scheduling Maturity score, see how you compare to typical and world-class plants, and download a one-page benchmark to take to your next review.
Your Scheduling Maturity score is ready.
From CMMS to KPIs you can defend, in four moves.
No rip-and-replace. Sockeye reads your existing system, you schedule visually, and it writes the finished plan straight back.
Connect your CMMS
Sockeye reads ready-to-schedule work orders from SAP PM, Maximo, JDE, Infor & more, or start file-based in ~2 weeks, no IT.
Drag-and-drop the week
Build next week visually. Real-time technician availability, PTO and skills are right there.
Balance in real time
Over-allocations and skill gaps flag instantly. Fill every tech to the right capacity.
KPIs, generated for you
Schedule compliance, planned vs reactive and PM completion come straight from the live schedule and write back to the CMMS. No manual reports.
5 days of work, now done in under an hour.
“What used to take me up to five days of work can now be done with Sockeye in just under an hour.”, Todd Hicks, Planning & Shutdown Superintendent, AV Group (Aditya Birla) · runs on IBM Maximo
Sockeye bolts onto SAP PM, IBM Maximo, Oracle JDE and more with configurable read/write field mapping, so your schedule compliance and audit trail come straight from the system of record.
Questions managers actually ask
Where do the schedule-compliance KPIs come from?
They are generated automatically from the live schedule in Sockeye, schedule compliance, planned vs reactive and PM completion, then written back to the CMMS. No manual spreadsheet assembly.
What if our planner is out, or leaves?
The schedule lives in Sockeye, not one person’s spreadsheet, so it survives turnover. Anyone on the team can pick up the week, and the full history stays intact.
Do we have to replace our CMMS?
No. Sockeye is a scheduling bolt-on. Your SAP PM / Maximo / JDE stays exactly where it is, Sockeye fixes the one workflow it’s bad at and writes the result back.
How long does it take to get going?
File-based (Excel export) go-live is about 2 weeks with no IT resources. Full API integration is typically 4 to 6 weeks. Training is ~1 hour, which is part of why adoption sits at 98%.
Is it secure?
SSO is supported, a CMMS-matched sandbox is available, and every schedule change is tracked for a verifiable audit trail.
“We built Sockeye because we were schedulers first. We know the Monday grind, the version chaos, the ‘who is actually in today?’ scramble, because we lived it. If your benchmark stung a little, good. That is exactly the gap we love helping people close.”
The Sockeye team · made by schedulers, for schedulers
See where your plant really stands.
Get your scheduling-maturity score and the board-ready one-pager for your next review.
Run my 90-second benchmark