See your free benchmark
For plant & site leaders

Stop asking how the week is going. See it.

One live maintenance schedule for the whole site, on top of SAP PM, Maximo or JDE: who’s on what, what’s slipping, and compliance KPIs that generate themselves. No rip-and-replace.

Free 90-second benchmark · get the board-ready one-pager for your next ops review · no sales call.

Sockeye · The site’s week, live
Sockeye showing live technician availability for the week, with shifts, PTO and training
Trusted by maintenance teams at
The week you can’t see

You run the site.
The week runs in a spreadsheet.

  • ✗  The maintenance week lives in one planner’s Excel file. They’re out, the site is blind.
  • ✗  You hear about slipped PMs and break-ins after production feels them.
  • ✗  Getting a status takes a meeting, a call, or a walk to the planning office.
  • ✗  Compliance and planned-vs-reactive numbers arrive days late, hand-built, if at all.
  • ✗  Corporate asks how the site is running. You’re relaying a guess.
Free benchmark · 90 seconds

How does your site’s scheduling really stack up?

Answer 11 quick questions. Get your Scheduling Maturity score, see how you compare to typical and world-class plants, and download a one-page benchmark to take to your next review.

Question 1 of 110%
Your result is ready

Your Scheduling Maturity score is ready.

See your full benchmark, your 3 biggest gaps and the board-ready PDF.

How Sockeye works

From CMMS to one live week, in four moves.

No rip-and-replace. Sockeye reads your existing system, you schedule visually, and it writes the finished plan straight back.

1

Connect your CMMS

Sockeye reads ready-to-schedule work orders from SAP PM, Maximo, JDE, Infor & more, or start file-based in ~2 weeks, no IT.

2

Drag-and-drop the week

Build next week visually. Real-time technician availability, PTO and skills are right there.

3

Balance in real time

Over-allocations and skill gaps flag instantly. Fill every tech to the right capacity.

4

KPIs, generated for you

Schedule compliance, planned vs reactive and PM completion come straight from the live schedule and write back to the CMMS. No manual reports.

Real maintenance teams

5 days of work, now done in under an hour.

5 days 1 hour
“What used to take me up to five days of work can now be done with Sockeye in just under an hour.”
, Todd Hicks, Planning & Shutdown Superintendent, AV Group (Aditya Birla) · runs on IBM Maximo
90%less weekly scheduling time
98%user adoption
2 wksto go live, no IT

Sockeye bolts onto SAP PM, IBM Maximo, Oracle JDE, Infor and more, with configurable read/write field mapping. And with 98% user adoption, the schedule in Sockeye is the schedule the site actually runs, one view everyone trusts.

Questions site leaders actually ask

How do I see the week without chasing anyone?

The schedule is one live, shared view: every crew, every job, every status. Check the site’s week, or a single work order, yourself, without asking for a report.

What if our planner is out, or leaves?

The schedule lives in Sockeye, not one person’s spreadsheet, so it survives turnover. Anyone on the team can pick up the week, and the full history stays intact.

Do we have to replace our CMMS?

No. Sockeye is a scheduling bolt-on. Your SAP PM / Maximo / JDE stays exactly where it is, Sockeye just fixes the one workflow it’s bad at and writes the result back.

How long does it take to get going?

File-based (Excel export) go-live is about 2 weeks with no IT resources. Full API integration is typically 4 to 6 weeks. Training is ~1 hour, which is part of why adoption sits at 98%.

Is it secure?

SSO is supported, a CMMS-matched sandbox is available, and every schedule change is tracked for a verifiable audit trail.

“We built Sockeye because we were schedulers first. We know the Monday grind, the version chaos, the ‘who is actually in today?’ scramble, because we lived it. If your benchmark stung a little, good. That is exactly the gap we love helping people close.”

The Sockeye team · made by schedulers, for schedulers

See how your site really runs.

Get your scheduling-maturity score and the board-ready one-pager for your next ops review.

Run my 90-second benchmark
Sockeye Technologies · Maintenance scheduling made easy · getsockeye.com