Every site schedules its own way. Until now.
Sockeye puts one scheduling standard on top of every plant’s CMMS, SAP PM, Maximo or JDE, site by site: the same live schedule, the same KPIs, comparable across the fleet. No rip-and-replace program.
Free 90-second benchmark · score one site now, roll the standard out later · no sales call.
Five sites, five spreadsheets,
five versions of “compliance.”
- ✗ Sites go rogue: each plant makes up its own scheduling process, Excel here, a whiteboard there.
- ✗ “Schedule compliance” is computed differently at every site, so the numbers can’t be compared.
- ✗ Management loses the ability to push best practices through, what the best site figured out never travels.
- ✗ The corporate rollup is hand-assembled from whatever each site sends up.
- ✗ Standardizing keeps slipping because every site looks like a new IT project.
How does one of your sites really stack up?
Answer 11 quick questions for one site. Get its Scheduling Maturity score, see how you compare to typical and world-class plants, and download a one-page benchmark to take to your next review.
Your Scheduling Maturity score is ready.
From every CMMS to one standard week, in four moves.
No rip-and-replace. Sockeye reads your existing system, you schedule visually, and it writes the finished plan straight back.
Connect each site’s CMMS
SAP PM at one plant, Maximo at another, JDE at a third. Sockeye bolts onto each, or starts file-based in ~2 weeks per site, no IT program.
Drag-and-drop the week
Build next week visually. Real-time technician availability, PTO and skills are right there.
Balance in real time
Over-allocations and skill gaps flag instantly. Fill every tech to the right capacity.
The same KPIs, every site
Schedule compliance, planned vs reactive and PM completion are generated the same way at every plant and write back to each CMMS. Rollups you can finally compare.
5 days of work, now done in under an hour.
“What used to take me up to five days of work can now be done with Sockeye in just under an hour.”, Todd Hicks, Planning & Shutdown Superintendent, AV Group (Aditya Birla) · runs on IBM Maximo
Sockeye bolts onto SAP PM, IBM Maximo, Oracle JDE, Infor and more, with configurable read/write field mapping, per site. Cargill replaced spreadsheet planning with Sockeye to free up PM capacity across its sites.
Questions enterprise leaders actually ask
Our sites run different CMMSes. Does that matter?
No. Sockeye bolts onto each site’s system of record, SAP PM, Maximo, JDE and more, with per-site field mapping. The scheduling layer and the KPIs are the standard; each CMMS stays put.
Are we forcing one workflow on every plant?
Only the scheduling layer is standard: one live schedule and KPIs computed the same way everywhere. Each site keeps its CMMS, its codes and its crews, which is part of why adoption holds at 98%.
Do we have to replace our CMMS?
No. Sockeye is a scheduling bolt-on. Your SAP PM / Maximo / JDE stays exactly where it is, Sockeye just fixes the one workflow it’s bad at and writes the result back.
How long does it take to get going?
File-based (Excel export) go-live is about 2 weeks with no IT resources. Full API integration is typically 4 to 6 weeks. Training is ~1 hour, which is part of why adoption sits at 98%.
Is it secure?
SSO is supported, a CMMS-matched sandbox is available, and every schedule change is tracked for a verifiable audit trail.
“We built Sockeye because we were schedulers first. We know the Monday grind, the version chaos, the ‘who is actually in today?’ scramble, because we lived it. If your benchmark stung a little, good. That is exactly the gap we love helping people close.”
The Sockeye team · made by schedulers, for schedulers
One standard. Every site.
Score one site now, see its gaps, then talk about rolling the same playbook across the rest.
Run my 90-second benchmark